Counting circuits for costing

Circuit counts are shown in Section H. of the electrical EICR and New Installation PDF’s

1. Which rows count as circuits

  • Only circuit rows on this certificate’s boards with a reference that isn’t 0.
  • On three-phase boards (phase 3 or TP&N), only phases L1, L2 and L3 count.
  • On other boards, phases L1, L2, L3 and S count.
  • Rows with phase N, blank, or a “…C” phase are never counted.

2. Weighting for three-phase circuits. This is the rule most likely to surprise someone pricing a job:

  • On a three-phase board, a circuit marked as 3-phase (TP / Y) counts as 3, not 1. The weight of 3 sits on its L2 row, and its L1 and L3 rows count 0.
  • Every other row counts 1. That includes single-phase circuits fed from L1, L2 or L3 on a three-phase board.
  • So a TP circuit at way 4 counts as 3 circuits.

3. Spare or energised. A circuit is spare if its description (equipment connected) is blank, or if it contains SPARE, WAY NOT AVAILABLE, NOT IN USE or UNUSED. The match ignores case, and the words can appear anywhere in the text, so “SPARED” or “DB1 SPARE WAY” also count as spare.

Field Rule
Total number of circuits Sum of the weights. Spares are included.
Number of SPARE / WAY NOT AVAILABLE circuits Weighted count of spare circuits, including blank descriptions.
Number of energised circuits Total minus spare.
Circuits with a Zs (spares excluded) Energised circuits whose Zs is a number above 0.
Zs = blank or 0 (spares excluded) Energised circuits with no Zs, or a Zs of 0.
Zs = LIM (spares excluded) Energised circuits with Zs exactly “LIM”.
Other value (spares excluded) Worked out in the PDF as Total − Spare − LIM − blank/0 − numeric. This catches text such as “N/A” or “>200”.

Points to watch when the count is used for pricing

  • Blank descriptions count as spare. A circuit that is really in use but has no description is left out of the energised count.
  • Each three-phase circuit counts as 3. A contractor pricing per circuit (or per way) would see this as 3. One pricing per test (one Zs) would see it as 1.
  • “Number of boards” includes every board on the certificate. That includes boards that have no circuits or were never tested.
  • Board-level ways are ignored. The Ways column in the table below the counts is shown, but it plays no part in the circuit totals.