Reducing building electrical data capture through the life of the asset

Large electrical data sets that need to be tracked over the life of the asset The end-to-end lifecycle of an electrical installation requires recapturing electrical data multiple times – this wastes time, reduces accuracy and costs more. EDIS provides a secure, auditable repository to share electrical distribution information at each stage of the lifecycle.  The […]

The EDIS Cycle saves administrative time and data capture time

Your time is valuable – The EDIS Cycle reduces administration and data capture time by more than 50% EDIS provides a system and process to reduce the cost and effort of maintaining your electrical compliance records.  This video walks through the EDIS cycle and the 8 steps required to save you time and effort in […]

EDIS BIM: BIM LEVEL 2 defines how information should be created, shared and managed.

BIM LEVEL 2 was introduced as a requirement for all government construction projects from April 4th 2016.  This puts the responsibility on the contractor to demonstrate that they have the processes in place to meet  the BIM Level 2 requirements.  Theses processes need to show how you will meet the project’s requirements and how you […]